AD: General Electric | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Sep 19, 2005

AD: General Electric

AD NUMBER: 2005-18-01
MANUFACTURER:
General Electric
SUBJECT: Airworthiness Directive 2005-18-01
SUMMARY: The FAA is adopting a new airworthiness directive (AD) for General Electric Company (GE) CT7-5A2, -5A3, -7A, -7A1, -9B, -9B1, and -9B2 turboprop engines, with stage 2 turbine aft cooling plate, part number (P/N) 6064T07P01, 6064T07P02, 6064T07P05, or 6068T36P01 installed. This AD requires a onetime eddy current inspection (ECI) of certain P/N stage 2 turbine aft cooling plate boltholes. This AD results from reports of six stage 2 turbine aft cooling plates found cracked during inspection. We are issuing this AD to prevent stage 2 aft cooling plate separation, resulting in uncontained engine failure and damage to the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20051801

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC