Ariane 5 For Arianespace's 6th Flight Of 2009 Is Ready For Assembly | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Aug 25, 2009

Ariane 5 For Arianespace's 6th Flight Of 2009 Is Ready For Assembly

Arianespace Targets 7 Launches For 2009

Launcher elements for the sixth mission in 2009 with Arianespace's workhorse Ariane 5 in 2009 are now at the Company's South American Spaceport, and are ready for assembly as the newest heavy-lift vehicle. These components were delivered aboard the MN Colibri, which is one of two sea-going vessels that transport Arianespace launchers from their manufacturers in Europe.

Using the MN Colibri's roll-on/roll-off configuration, the Ariane 5's cryogenic core stage and upper stage were driven from the ship at Pariacabo port near the city of Kourou to the Spaceport - where they were positioned in the Launcher Integration Building's receiving area. This launcher will be the 192nd Ariane family vehicle assembled at the Spaceport. It is part of a record year for mission activity with the Ariane 5, during which Arianespace is targeting a total of seven launches.

Ariane 5 File Photo

The 190th Ariane family vehicle lifted off from the Spaceport's ELA-3 launch pad late last week, using a heavy-lift Ariane 5 ECA to orbit the JCSAT-12 and Optus D3 telecommunications satellites. It was Arianespace's fourth flight with the Ariane 5 in 2009. Arianespace's next mission - the 191st flight for a member of the Ariane family - will utilize an Ariane 5 ECA that has completed its build-up in the Launcher Integration Building. This vehicle is now ready for its transfer to the Spaceport's Final Assembly Building.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC