Dream Chaser Spacecraft Passes Key NASA Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jan 01, 2019

Dream Chaser Spacecraft Passes Key NASA Milestone

Production Of Orbital Spacecraft To Begin

Sierra Nevada Corporation’s (SNC) Dream Chaser spacecraft passed a key milestone for NASA’S Commercial Resupply Services 2 (CRS-2) contract, validating design performance and clearing the way for full spacecraft production. The milestone marks completion of Integration Review 4 (IR4) demonstrating NASA’s confidence in the safety and maturity of Dream Chaser’s design.

"NASA's acknowledgement that SNC has completed this critical milestone and its approval of full production of the first Dream Chaser spacecraft is a major indication we are on the right path toward increasing vital science return for the industry," said John Curry, program director for CRS-2 under SNC’s Space Systems business area.

Many critical parts of the orbital vehicle are already complete, built and being tested, including major structural components, thermal protection system tiles and avionics hardware. With the success of IR4, these components are now being integrated into the orbital vehicle assembly at SNC’s Space Systems facilities in Louisville, CO.

Subject matter experts from NASA and SNC thoroughly reviewed the Dream Chaser spacecraft design and its integrated performance with launch, ground and flight elements. Based on system capabilities, design maturity and the extensive data products presented, SNC and NASA jointly concluded the Dream Chaser program was ready to move to full-scale spacecraft manufacturing and testing.

SNC’s Dream Chaser spacecraft is slated to service the International Space Station as early as late 2020. Production includes both the uncrewed Dream Chaser winged vehicle and the cargo module, which remains attached to the winged vehicle during orbital operations.

“We are one step closer to the Dream Chaser spacecraft’s first orbital flight. This comprehensive review approved moving the Dream Chaser program into the production phase so we can get Dream Chaser to market as a critical space station resupply spacecraft as soon as possible,” said Fatih Ozmen, co-owner and CEO of SNC. “IR4 was a series of reviews, documentation, and data deliverables that are the culmination of many years of design work, analysis and development testing.”

The Dream Chaser will perform at least six missions to provide cargo resupply, disposal and return services to the International Space Station under NASA’s CRS-2 contract. The spacecraft delivers up to 12,100 lbs of pressurized and unpressurized cargo and returns over 4,000 lbs of cargo with a gentle runway landing. The spacecraft also provides approximately 7,400 lbs of disposal capability each mission via the cargo module, which burns up in the atmosphere after separation from the Dream Chaser winged vehicle.

(Image provided with Sierra Nevada Corp news release)

FMI: www.sncorp.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC