NTSB, Honeywell To Participate In Ethiopian Dreamliner Fire Probe | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jul 17, 2013

NTSB, Honeywell To Participate In Ethiopian Dreamliner Fire Probe

Honeywell Built The ELT Which Was Installed In The Area Where The Fire Occurred

The NTSB has sent investigators to assist in the investigation of a fire that occurred last week aboard a parked Boeing 787 Dreamliner at Heathrow Airport, London, England.

NTSB Senior Air Safety Investigator Lorenda Ward has been appointed as the traveling U.S. accredited representative. Ms. Ward will be accompanied by NTSB airplane systems investigators and representatives from the Federal Aviation Administration and Boeing.

The investigation is being conducted by the Air Accidents Investigation Branch (AAIB) of the United Kingdom, which will release all information.

A team from Honeywell has also been sent to London. The fire reportedly occurred in an area where the plane's ELT, which is manufactured by Honeywell, is installed. The plane had been parked empty in a remote area of Heathrow airport for nearly eight hours when the fire broke out. No one was on board at the time.

The Dreamliner's batteries have already been ruled out as a cause of the fire.

The Los Angeles Times reports that Honeywell spokesman Steve Brecken said that ELTs such as the one installed on the Ethiopian Dreamliner are operating on over 3,000 airplanes from multiple manufacturers, and "we've not seen or experienced a single reported issue with this product line." He said any speculation about the device would be "premature."

Reuters reports that investigators are looking at the battery that powers the ELT as a possible culprit in the latest Dreamliner incident. The FAA reportedly told airlines that a battery installed in a Honeywell ELT had failed a test in 2009, and advised that they be replaced. Honeywell said it was checking to determine if the battery installed in the Ethiopian Dreamliner was the same model as had failed the 2009 test. The ELTs are powered by a non-rechargeable lithium-manganese battery, according to the report.

FMI: www.ntsb.gov, www.boeing.com, www.honeywell.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC