Urgent AD (CASA): Turbomeca | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 05, 2009

Urgent AD (CASA): Turbomeca

AD NUMBER: AD/MAKILA/14

MANUFACTURER: Turbomeca Turbine Engines - Makila SeriesSUBJECT: Airworthiness Directive AD/MAKILA/14

Applicability: Makila 1A and 1A1 turboshaft engines, all serial numbers, having Engine Control Units (ECU) equipped with TU250 Comparator / Selector (CS) boards with serial numbers (S/N) in the range 241 EL to 1192 EL.

Note 1: CS boards with S/N in the above range are hereafter referred to as the
suspect batch.
Note 2: Makila 1A and 1A1 engines are installed in, but not limited to, Eurocopter
AS 332 C, C1, L and L1 helicopters.

Requirement: 1. If both TU250 CS boards on the same helicopter are from the suspect batch and if both have an operating time since new of less than 200 hours, unless previously accomplished, replace at least one of the boards with a board not from the suspect batch in accordance with the instructions of Turboméca Mandatory Service Bulletin (MSB) 298 73 0809 Version A dated 12 February 2008.

2. Unless accomplished previously, replace all TU250 CS boards from the suspect batch with boards not from the suspect batch in accordance with the instructions of Turboméca MSB 298 73 0810 Version B dated 27 April 2009.

Replacement of all TU250 CS boards, accomplished prior to the effective date of this Directive, in accordance with Turboméca MSB 298 73 0810 Version A dated 12 February 2008 is acceptable for compliance with Requirement 2.

The use of later Versions of the above MSBs, approved by the European Aviation Safety Agency (EASA), are acceptable for compliance with the requirements of this Directive.

Note 3: EASA AD 2009-0090 refers.

Compliance: For Requirement 1 - Within 50 hours time in service from the effective date of this Directive.

For Requirement 2 - During the next 500-hour routine inspection, or before 30 November 2009, whichever occurs first.

Background: Makila 1A and 1A1 ECUs incorporate a backup control law that fixes N1 (gas generator speed) at 65% when at least two of the three N2 (power turbine speed) signals are lost. The intent is to limit the maximum speed attainable by the power turbine in the event of a failure of the shaft between the engine and the main gearbox that could result in collateral damage to the N2 speed probes.

Several occurrences of 65% N1 backup activation remain unexplained despite detailed investigation. It is postulated that the events may have been due to corruption of the engine N2 speed signals by short perturbations, for example by electromagnetic interference. The potential therefore existed for a hazardous condition in which both engines on the same helicopter were simultaneously affected. To address this risk, Turboméca introduced modification TU250, which affects the CS board in the ECU and allows recovery from the 65% backup mode if the loss of N2 speed signals is determined to be temporary. Incorporation of modification TU250 was mandated by AD/MAKILA/9 (EASA AD 2007-0144).

The installation of TU250 CS boards, however, has resulted in a few occurrences of erratic engine behaviour, in the form of unexpected N1 variations and/or illumination of the “GOV” warning light. The conclusions from an investigation by Turboméca are that these malfunctions are due to a lapse of quality control in the varnishing process applied to the boards, and that only boards in a specific serial number range, as defined under “Applicability” and referred to below as the “suspect batch”, are affected.

Turboméca has addressed this latest concern in two steps which provide first a nearterm and then a long-term solution. The two steps are described in the referenced mandatory service bulletins (MSB).

The first step, described in MSB 298 73 0809, recommends that no helicopter has CS boards from the suspect batch in both engines. Boards with more than 200 hours of trouble-free operation are exempt because service experience has shown that the malfunctions potentially induced by this manufacturing discrepancy are most likely to occur early in the lives of the boards.

The second step, described in MSB 298 73 0810, recommends that ultimately all TU250 CS boards in the suspect batch, regardless of time in operation, be replaced with TU250 boards not from the suspect batch. 

FMI: http://www.casa.gov.au/wcmswr/_assets/main/airworth/airwd/adfiles/turbine/makila/makila-014.pdf

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC