Boeing Says Dreamliner Production Has Resumed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Jan 31, 2009

Boeing Says Dreamliner Production Has Resumed

Asserts First 787 Will Fly In Second Quarter

Boeing says production of its 787 Dreamliner resumed Thursday, for the first time since last year's  machinists strike, with the join of the fifth airplane designated for flight test. Aircraft ZA005 is the first to be powered with General Electric GEnx engines.

The major assemblies were loaded in final body join over the past several days. The fuselage and wing joins occur simultaneously.

"This airplane signifies our return to a steady production rhythm," said Jack Jones, vice president of 787 Final Assembly and Change Incorporation. "Sections are arriving in Everett at the completion levels committed by our partners and close to what is expected for mature production. The substantial progress made by our partners streamlines the assembly process, which is essential as we ramp up production."

Five of the six airplanes designated for flight test are now in varying stages of production. Power was restored earlier this week to the first flight-test airplane, ZA001, and production testing has resumed as the airplane prepares for first flight in the second quarter.

Rolls-Royce engines are hung on ZA002, in the fourth and final production position in the factory. The third and fourth flight-test airplanes, ZA003 and ZA004, are in the third and second production positions, respectively.

Fastener rework is done on ZA001, nearly complete on ZA002 and progressing well on the third and fourth airplanes, Jones said. As ANN reported earlier this week, Boeing has opted to leave out-of-spec fasteners in hard-to-reach, non-crticial places, in order to meet the planemaker's latest timeframe for the troubled program.

"We have applied the resources necessary to complete all the outstanding work on these airplanes and keep the production line moving forward," Jones stressed.

Assemblies for the final flight-test airplane, ZA006, are in production at partner sites worldwide. In all, assemblies for 30 Dreamliners are in production at this time.

The Dreamliner has orders for 895 airplanes from 58 airlines. That figure was once over 900 aircraft... but this week, Russian airline S7 announced it has cancelled its order for 15 planes, due to uncertainty about the global economy. The airline now plans to lease those planes from a third party.

FMI: www.boeing.com/commercial/787family/

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC