AD: Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 06, 2011

AD: Boeing

AD NUMBER: 2011-09-14

MANUFACTURER: The Boeing Company Model 747-200B, -300, -400, -400D, and -400F Series Airplanes Powered by Pratt and Whitney 4000 or General Electric CF6-80C2 Series Engines
SUBJECT: Airworthiness Directive2011-09-14

SUMMARY: This AD requires an inspection to determine the part number of the mid-pivot access door and to determine if the correct door is installed, and the installation of a marker on the mid-pivot access door, and if necessary, repetitive ultrasonic inspections for cracking of the mid-pivot bolt  assembly and eventual replacement of the mid-pivot bolt assembly.

This AD was prompted by a report that the left and right access doors of the spring beam mid-pivot bolt assembly for the No. 1 strut were inadvertently installed in the incorrect position during strut modification. This AD has been issued to detect and correct incorrectly installed mid-pivot bolt assemblies on the spring beam on the outboard struts. Incorrectly installed bolt assemblies could lead to fatigue cracking and consequent fracturing of the mid-pivot bolt assembly, which could lead to loss of the spring beam load path and the possible separation of a strut and engine from the airplane during flight.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/B73619B294065D97862578840056AAC8?OpenDocument

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC