100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC