AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, May 15, 2018

AD: Bombardier, Inc., Airplanes

AD NUMBER: 2018-09-15

PRODUCT: Certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2016-25-18, which applied to the aircraft listed above.

AD 2016-25-18 required an inspection for discrepancies of the attachment points of the links between the engine rear mount assemblies, and corrective actions if necessary. This AD requires an inspection of certain attachment points, corrective action if necessary, and replacement of certain bolts and nuts in the engine rear mount assemblies.

This AD also adds airplanes to the applicability. This AD was prompted by the determination that replacement of certain nuts and bolts in the engine rear mount assemblies is necessary.

DATES: This AD is effective June 15, 2018.

COST: The FAA estimates that this AD affects 97 airplanes of U.S. registry.

The actions required by AD 2016-25-18, and retained in this AD take about 1 work-hour per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2016-25-18 is $85 per product.

The retained on-condition costs in this AD take about 2 work-hours per product, at an average labor rate of $85 per work-hour. Required parts cost about $730 per product. Based on these figures, the estimated cost of the on-condition actions that are required by AD 2016-25-18 is $900 per product.

The FAA has received no definitive data that would enable us to provide cost estimates for other retained on-condition actions specified in AD 2016-25-18. It will take about 4 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost up to $14,940 per product. Based on these figures, the estimated cost of this AD on U.S. operators to be up to $1,482,160, or up to $15,280 per product. No definitive data has been received that would enable the FAA to provide cost estimates for the oncondition actions specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC