Long Beach Council To Vote On Airport Size | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Apr 19, 2007

Long Beach Council To Vote On Airport Size

Opponents Urge Incremental Expansion

Expansion plans for the Long Beach (CA) International Airport continue to meet with opposition. In a special session Tuesday, the Long Beach City Council heard a presentation from HOK, the architectural firm contracted to design the expansion.

The new proposal reduces the airport's space to 89,995-square-feet from 97,545-square-feet. Currently, the terminal is 56,320-square-feet. As ANN reported, the environmental impact report allowed for a maximum of 102,850 square feet.

While the firm presented its reduced plan, opponents continued to protest the validity of the EIR, complaining about the potential for increased noise and pollution a larger and busier airport might bring, according to the Long Beach Press Telegram.

HOK achieved the cuts by trimming the size of the security screening area, operations office, conference room, office space and ticketing areas. Opponents of the EIR, which the council certified in 2006, asked the council to "think about the residents."

"The number one thing you are here for is to protect residents," said Lillian Kawasaki, who sits on the Water Replenishment District. She urged the council to make incremental additions and claims the city, by law, cannot decrease the airport's size.

The Long Beach Unified School District and the Long Beach PTA have filed lawsuits to challenge the EIR, thus prompting Tuesday's meeting. The lawsuits demands the city provide noise soundproofing for a number of campuses should the expansion occur.

Terry Jensen, who opposes the EIR certification, warned against approving too large an airport.

"We should not build any excess space in that facility," he said.

The city should consider all legal and environmental consequences of an expansion as well as the fact that consultants gave differing accounts, according City Councilman Patrick O'Donnell.

"This is a really subjective exercise," he said.

The council will vote on the airport's size at its next meeting on April 24.

FMI: www.longbeach.gov/airport/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC