STS-124 Completes Second Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Jun 06, 2008

STS-124 Completes Second Spacewalk

Garan, Fossum Install Cameras On Kibo

Mission Specialists Mike Fossum and Ron Garan completed the second STS-124 spacewalk Thursday. The 7-hour, 11-minute excursion ended at 1815 EDT.

The astronauts completed a number of tasks to outfit the Kibo Japanese Pressurized Module, or JPM. They installed television cameras on the front and rear of the JPM to assist Kibo robotic arm operations, removed thermal covers from the Kibo robotic arm, and prepared an upper JPM docking port for Friday's attachment of the Kibo logistics module.

The spacewalkers installed two cameras on the Japan Aerospace Exploration Agency’s Kibo laboratory. NASA says these cameras will be used to judge clearances for the module’s robotic arm.

Garan and Fossum also prepared the laboratory’s top active common berthing mechanism for the attachment of the smaller section of the module, the Japanese Experiment Logistics Module -- Pressurized Section, which was delivered during STS-123.

In addition, the two spacewalkers made preparations for a nitrogen tank assembly swap they will make on their third spacewalk, scheduled for Sunday. They also removed an external television camera that had a failing power supply.

Fossum also inspected the space station's port solar alpha rotary joint, or SARJ. Unlike the starboard SARJ, the port SARJ has performed flawlessly. The inspection was done to ensure the port SARJ remains in good condition.

This was Fossum's fifth spacewalk, Garan's second, the 111th spacewalk devoted to space station assembly and maintenance, the 12th of 2008, and the 196th by  astronauts.

FMI: www.nasa.gov

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC