Endeavour Countdown Set To Begin Again | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jul 03, 2009

Endeavour Countdown Set To Begin Again

Launch Planned For July 11th

Launch preparations are under way at NASA's Kennedy Space Center in Florida following Wednesday's successful test fueling of space shuttle Endeavour's external tank.

Two previous attempts to launch Endeavour on the STS-127 mission were halted by a leak in the area of the Ground Umbilical Carrier Plate, which attaches a gaseous hydrogen vent line to the external tank. After several days of investigation and repair work, the massive orange tank was filled with liquid hydrogen and liquid oxygen as controllers watched for evidence of leaks. The system performed well, verifying the success of the repair.

"There were absolutely no leak indications whatsoever noted on the two leak detectors," said Launch Director Pete Nickolenko. "We'll continue to look at the data, and our next step is to move toward launch."

Endeavour's astronauts are taking the holiday weekend off and will go into quarantine Sunday evening. They are due to arrive at Kennedy on July 7th. The countdown will officially begin Wednesday at 2200 when clocks begin ticking backward from T-43 hours. Liftoff is set for July 11 at 1939.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC