Juneau, Feds Can't Agree On Runway Plan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Apr 21, 2005

Juneau, Feds Can't Agree On Runway Plan

Alaskan City's Airport Funding Could Be At Stake

The engineered-material arresting system has so far been a success, saving five aircraft from expensive and perhaps even deadly mishaps. The crushed material at the end of runways is designed to slow a speeding aircraft to a stop without causing severe damage, when they might otherwise run off the end of a runway and into whatever lies beyond.

So why don't airport officials in Juneau, AK, want to install it?

So far, 15 airports nationwide have installed the collapsible cement blocks in runway safety areas that are 1,000 feet long and 500 feet wide. As Juneau International Airport officials contemplate how to comply with the requirement for a safety area, they're studying five options -- two of which include an engineered materials system.

But even though the FAA says it's a proven system, Juneau International Airport Board Chairman Ron Swanson isn't sure about EMAS. He's specifically worried about the weather.

"This is untried in Alaska," Swanson told the Juneau Empire. "There are two major reasons to cause accidents: wind shear and pilot misjudgment. A standard runway safety area is longer and can protect the airplanes and its occupants."

Swanson said he's specifically worried about Alaska's bitter cold in trying to maintain an engineered material safety area. "You cannot plow snow with a truck on it. This thing would cave in," Swanson said. "You have to have special equipment to remove snow."

The five options are part of the FAA's Environmental Impact Study, set for release on Monday. While two of the options involve the new arresting system, two are designed in the traditional sense and one is a combination of both.

The EIS will be the subject of community hearings in Juneau on June 1st and 2nd. If airport officials refuse to comply with the FAA's directives on the subject, they stand to lose their federal airport grants -- although there's no clear indication that's even being contemplated at this point.

FMI: www.juneau.lib.ak.us/airport/index.php

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC