Discovery Engines Removed Due To Turbopump Problem | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Jun 24, 2010

Discovery Engines Removed Due To Turbopump Problem

Engineers Say It Should Not Create A Delay For STS-133

Space shuttle Discovery will have its three main engines removed after a low-pressure oxidizer turbopump on engine 1 had an issue during a torque check. All three engines have to be removed to allow access to remove the center engine. The pump will be sent to Canoga Park, CA, for repair.

Engineers considered several alternatives, including whether to wait for the engine and its new turbopump or to install another engine in Discovery that was slated for use on Endeavour. The engine work is not a hindrance to processing and is not expected to prompt a delay for the launch of the STS-133 mission. Removal of the three main engines is planned for Thursday, and it was determined that the turbopump should be replaced and the engines will be reinstalled.

Meanwhile, technicians completed Discovery's payload premate test Wednesday. The drag chute door installation and checkout was completed Tuesday night.  The astronauts continue their training at NASA's Johnson Space Center in Houston for the STS-133 mission, with the crew members are working on robotics tasks they will use during the flight to the International Space Station. They are also undergoing refresher training on International Space Station systems.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC