Third Dreamliner Assembly Line Ramping Up Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 30, 2012

Third Dreamliner Assembly Line Ramping Up Production

Boeing Working To Catch Up On 800 Orders For The 787

With some 800 Dreamliners on the order books, Boeing has opened a temporary assembly line for the composite airliners at its Everett, WA, plant. The line is the second producing the airplane in the Puget Sound area, and the third for the company overall.

On his blog, Boeing Commercial Airplane marketing VP Randy Tinseth said the "surge line", will allow Boeing to roll 10 Dreamliners a month out of the doors by the end of next year. It is currently averaging 3.5 per month. He also said that it will help facilitate the introduction of the larger 787-9 into production next year.

Tinseth said the line is different from the company's other two assembly lines. "Instead of moving down the line in a nose-to-door configuration, airplanes will be staged in a slanted arrangement at Position 3," he wrote. "After completing interior installations, the airplane will move to Position 4 over on the original line. That’s because work in Position 4 can occur at a faster rate so we can accommodate airplanes from both the original line and the temporary surge line."

The third Dreamliner production line is in North Charleston, SC.

(Boeing photo by Gail Hanusa)

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC