ASB Avionics Develops HF Shunt Antenna For P-3 Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Mon, Sep 07, 2009

ASB Avionics Develops HF Shunt Antenna For P-3 Aircraft

Also Moves Forward On AFCS For The C-130

ASB Avionics (ASB), under contract with the NOAA, is developing a Dorsal HF Shunt Antenna for their WP-3 fleet. The P-3 HF Shunt Antenna builds on ASB’s history of HF Dorsal Antennas for L-382/C-130, KC-135, 707, 737, and 747 aircraft. The P-3 HF Shunt Antenna will eliminate the requirement for the existing dual long-wire HF antennas and will replace the existing dorsal leading edge allowing the antenna couplers to be mounted within the pressure vessel. The P-3 HF Shunt Antenna will require minimal maintenance, be immune to precipitation static buildup, lighting strikes, and damaging antenna wire breakage, and will reduce drag; improving fuel specifics. The new antenna is designed to be installed on all P-3 variants.

 

P-3 Shunt Antenna Drawing

Based on its other HF Antenna products ASB expects the RF performance to be substantially better than the less efficient long-wire antennas, as well as reducing Life Cycle Costs (LCC).

In other news, ASB is in the final stages of FAA approval of its dual digital Automatic Flight Control System (AFCS) for the L-382/C-130 replacing the obsolete existing analog flight director/autopilot systems. The Honeywell provided AFCS will complement ASB’s previously FAA certified Commercial Off The Shelf (COTS) Avionics Modernization Program (AMPS). The new AFCS replaces all existing analog flight director/autopilot components, substantially reducing Line Replaceable Unit (LRU) and wire count. The high Mean Time Between Failure (MTBF), low acquisition costs, and auto-flight characteristic improvements will help in reducing the LCC and improve the functionality and useful life of legacy L-382/C-130 airframes. Certification is expected by October 1st.

 

ASB L-382/C-130 Panel

ASB is also developing an Enhanced Vision System (EVS) installation to complement the L-382/C-130 ASB COTS AMP and expects FAA  certification, parallel to AFCS approval.

FMI: www.asbavionics.com

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC