NASA Defers Setting Next Shuttle Launch Date | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Feb 22, 2009

NASA Defers Setting Next Shuttle Launch Date

Flow Control Valve Concern Requires More Study

During a thorough review of space shuttle Discovery's readiness for flight, NASA managers decided Friday more data and possible testing are required before proceeding to launch. Engineering teams have been working to identify what caused damage to a flow control valve on shuttle Endeavour during its November 2008 flight.

As ANN reported, NASA found one of those valves damaged in Endeavour after that shuttle's mission in November. As a precaution, Discovery's valves were removed, inspected and reinstalled. It's not clear yet what the nature of the problem is.

"We need to complete more work to have a better understanding before flying," said Bill Gerstenmaier, associate administrator for Space Operations at NASA Headquarters in Washington. Gerstenmaier chaired Friday's Flight Readiness Review.

"We were not driven by schedule pressure and did the right thing. When we fly, we want to do so with full confidence."

The shuttle has three flow control valves that channel gaseous hydrogen from the main engines to the external fuel tank. Teams also have tried to determine the consequences if a valve piece were to break off and strike part of the shuttle and external fuel tank.

The Space Shuttle Program has been asked to develop a plan to inspect additional valves similar to those installed on Discovery. This plan will be reviewed during a meeting on Wednesday, February 25. Afterward, the setting of a new target launch date may be considered.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC