NASA Restarts Shuttle Countdown | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 05, 2006

NASA Restarts Shuttle Countdown

Weather Looks Good For Wednesday Launch

They're counting down again at the Kennedy Space Center... ticking away the minutes ahead of Wednesday's scheduled launch of the shuttle Atlantis.

"At the end of the day we did our readiness poll to continue from here toward launch and we got a 'go' from all the elements and we feel like we're in very good shape," said LeRoy Cain, launch integration manager, after reviews by the mission management team,

This will be the fourth try for Atlantis and STS-115... after a lightning strike forced two delays, and Tropical Storm Ernesto scrubbed plans for a third attempt last week.

The launch is set for 12:29 Eastern Time Wednesday afternoon, and forecasts call for only a 20 percent chance of a "no go" decision due to weather at that time.

Between now and then, engineers and technicians are going over the shuttle with a fine-toothed comb... checking all systems and replacing fuel emptied from the orbiter in anticipation of its planned move back to the Vehicle Assembly Building.

As Aero-News reported, before the shuttle was halfway to the Vehicle Assembly Building -- and shelter from the tropical storm -- launch managers decided it would be okay to put Atlantis back on the pad, as Ernesto's winds weren't as bad as had been initially forecasted.

That decision means the orbiter still has a chance to fly this month -- before a scheduled Soyuz mission to the International Space Station.

Commander Brent Jett and his five crewmates (above) will travel to the International Space Station to install a new 17-ton segment of the station's truss backbone, adding a new set of giant solar panels and batteries to the complex. Three spacewalks are planned.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC