Ariane 5 Rolls Out To The Spaceport's Final Assembly Building | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Oct 06, 2014

Ariane 5 Rolls Out To The Spaceport's Final Assembly Building

VA220 Scheduled For Launch October 16 With Two Satellites On Board

Ariane 5 is on the move as launcher and payload preparations continue in French Guiana for Arianespace’s upcoming dual-passenger mission at the service of Intelsat, DIRECTV and ARSAT.

The heavy-lift Ariane 5 vehicle for Arianespace’s next launch – designated Flight VA220 – is now inside the Spaceport’s Final Assembly Building following its transfer by rail from the Launcher Integration Building on a mobile launch table.

With Ariane 5 now under Arianespace’s responsibility, this workhorse launcher is in position to receive its ISDLA-1 and ARSAT-1 payloads, which will be followed by final verifications and subsequent rollout to the Spaceport’s ELA-3 complex for an October 16 liftoff.
 
Meanwhile in separate Flight VA220 activity at the Spaceport, fueling is underway for ARSAT’s ARSAT-1 spacecraft in the S5 payload preparation building. Completion of this step will clear the way for transfer of the INVAP-produced satellite to the Final Assembly Building, where it is to be integrated with Ariane 5.
 
Joining ARSAT-1 on Arianespace’s fifth Ariane 5 flight of 2014 is ISDLA-1 – which will be orbited for long-standing Arianespace customers Intelsat and DIRECTV and is built by SSL (Space Systems/Loral).

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC