Boeing Swings The Gear On First 787 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Aug 14, 2008

Boeing Swings The Gear On First 787

Look Ma... No Legs!

Progress on Boeing's oft-delayed 787 Dreamliner continues to move slowly towards first flight, scheduled for November. Last weekend, Boeing began tests of the landing gear on the first aircraft, swinging both the nosegear and main landing gear as part of its testing efforts.

The Seattle Times reports the nose and main gear assemblies were first tested separately, and then jointly -- just as they operate on in-service aircraft. Testing was scheduled to continue throughout the week.

Boeing debuted the first 787 in a flashy public ceremony in July 2007. At that time, however, the plane was little more than a cobbled-together shell, with few major systems installed. Customers and pundits alike questioned whether Boeing would be able to meet its ambitious schedule, which called for certification of the first 787 delivery by May 2008.

Boeing boldly downplayed those fears... but if anything, those predictions of gloom were optimistic. Supplier issues, a shortage of the specialized fasteners needed to assemble the 787's innovative composite "barrel" sections, and problems integrating the plane's many complex subsystems made Boeing's earlier Dreamliner assertions a true nightmare.

In April, Boeing announced its third delay to the Dreamliner program... pushing off first flight to the end of 2008 and "approximately" 25 deliveries the year after, starting in the third quarter of 2009. For the moment, the company is sticking to that schedule.

Though it may seem a rather mundane accomplishment, the gear trials mark one of the most significant tests of systems integration on the first airframe, since the company completed power-on of the aircraft in June.

Swinging the landing gear taxes the 787's electrical and hydraulic systems, as well as its structure.

FMI: www.boeing.com, Watch Boeing's Video Of The Gear Tests

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC