SecDef Turns To GOP Freshmen To Kill F136 Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Feb 16, 2011

SecDef Turns To GOP Freshmen To Kill F136 Engine

Hopes More Conservative Climate Will Turn Tide In His Favor

Secretary of Defense Robert Gates is turning to an increasingly conservative majority in the U.S. House of Representatives in an effort to strip funding for the F136 engine out of the defense budget.

Gates has said repeatedly that he does not think the engine is necessary, and points to the program as a poster child for wasteful government spending. The engine is being developed jointly by Rolls Royce PLC and GE at a facility in Ohio.

While Gates has stripped funding for the alternate engine for the F-135 Joint Strike Fighter every year for the last several years, Congress continues to fund the program over the objections of the Defense Department and the President. With the House scheduled to begin debate on the defense budget this week, Gates said he hopes the members will finally see things his way. The Wall Street Journal reports that, should that not be the case, he will "look at all legal options to close down this program."

 
GE F136 Ohio Test Facility

GE responded to the secretary by e-mailing a statement in which company spokesperson Rick Kennedy said the debate on the floor of the house needs to be about "whether to hand a $100 billion monopoly (to) a single engine supplier."

There has been $3 billion already spend on the F136 alternate engine. Georgia Republican Lynn Westmorland called that spending "unnecessary," and said there are estimates that show it will cost an additional $3 billion to make the engine operational. GE spokesman Kennedy said that number was closer to $1.8 billion.

FMI: www.dod.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC