Boeing To Move Dreamliner Horizontal Stabilizer Production Line | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Mar 18, 2012

Boeing To Move Dreamliner Horizontal Stabilizer Production Line

Will Be Fabricated In Utah And Italy By The End Of This Year

Boeing plans to move fabrication of horizontal stabilizers for the Dreamliner to Salt Lake City and Italy by the end of the year. Company officials say the move will not cost any workers in Seattle their jobs.

The components are currently being produced in the Development Center in Seattle, according to a report in Reuters. Boeing will shift that work to Utah and Alenia Aermacchi in Italy.

Boeing spokesman Doug Alder told the news service that the horizontal stabs have been in a development stage, and now that production is ramping up, the fabrication can move out of the Seattle area. But, he said, ongoing development of the horizontal stabilizer for the larger 787-9 model will protect the jobs of workers there, and jobs will be added in Utah to handle the production.

The first stabilizer from the Salt Lake City facility should be delivered early next year. Dates are still being finalized for delivery of the first of the tailplanes to be manufactured in Italy. One of the many delays of the 787-8 was due to a fabrication problem at Alenia, a division of Finmeccanica.

Delivery of the first horizontal stabilizers for the -9 Dreamliner are expected early in 2014.

FMI: www.boeing.com

 


Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC