Embraer Reports Progress On Phenom 300 Development | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 31, 2009

Embraer Reports Progress On Phenom 300 Development

Fourth Aircraft Joins Test Fleet

Brazilian planemaker Embraer tells ANN it is moving "steadily forward" with its Phenom 300 light jet program, with the first flight of the fourth test aircraft at the end of February 2009.

This jet, with registration number PP-XVL, and the third (PP-XVK), which first flew on December 23, 2008, are being operated from the Company’s Flight Test Center at the Gavião Peixoto plant, in Brazil, alongside the first two Phenom 300 executive jets.

The test fleet is comprised of four aircraft: two fully instrumented, one equipped with basic interior and flight test instrumentation, and another with interior furnishings, which will be used for function and reliability tests and in the maturity campaign. So far, the entire fleet has performed over 300 hours of test flight campaign.

"As the Phenom 300 light jet certification and maturity campaign progresses, the deliveries of the first Phenom 100 entry level jets are taking place," said Maurício Almeida Filho, Embraer Vice President, Programs – Executive Jets. "We expect this crucial phase for the Phenom 300 to be every bit as successful as it was for the Phenom 100."

Flight and ground tests are presently moving ahead, having already concluded in-flight engine thrust determination (IFTD) and restart, water spray, fire extinguishing, fuel tests, and artificial ice shapes, among others. The Phenom 300 has flown at an altitude of 45,000 feet, while maintaining the cabin altitude as low as 6,600 feet. It has demonstrated the maximum cruising speed of 450 knots (KTAS), or 833 km/h, and Mach 0.78. Rigs have been used to refine avionics, to check the airplane’s environmental systems, and to test the electrical system.

Ongoing tests include aerodynamics and natural ice, as well as data collection for the full flight simulator development. The autopilot is being put through its paces, and avionics tests are successfully proceeding. Lightning strike, High Intensity Radiated Field (HIRF), external noise, crosswinds, and cold soak tests are scheduled to begin, soon.

The Phenom 300 certification campaign will require around 1,400 flight hours, and progresses toward its conclusion in the second half of 2009. The Phenom 100 and Phenom 300 light jets have a combined sales backlog of more than 800 aircraft, according to Embraer.

FMI: www.embraer.com

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC