Vought Suspends Production Of 787 Fuselage Segments | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Nov 11, 2008

Vought Suspends Production Of 787 Fuselage Segments

IAM Strike At Boeing Leads To Supply Glut

Even with the nearly two-month Boeing strike by the International Association of Machinists now resolved, ripples are still being felt by the aerospace company's suppliers.

The Seattle Times reported Monday that Vought Aircraft, which produces rear fuselage segments for the composite-bodied 787 Dreamliner at its plant in Charleston, SC, has slashed production nearly to a crawl due to a bottleneck in the supply chain.

Boeing was forced to halt almost all commercial airliner production due to the IAM strike. However, Vought continued building the fuse segments throughout the strike, hoping a quick resolution would surface.

That didn't happen, though... and with production lines at Boeing still idled, that led to an overage of parts waiting to be shipped to Everett, WA. Vought stopped production October 24, with fuselage segments through airplane 19 ready to be shipped.

The halt to further production work at Vought also necessitates massive layoffs, as the line isn't expected to be restarted until sometime next year. Joy Romero, Vought's 787 program manager, says about 170 Vought workers in Charleston and another 20 contract workers will be handed their walking papers Thursday.

As many as 400 workers total will be handed their walking papers, or roughly half of all Vought employees responsible for the 787 program. The company also has a 787 engineering and support facility in Dallas, TX.

"Boeing cannot simply 'turn the switch on' and be back up to speed instantaneously. It will take them time to ramp back up to schedule," Romero wrote in a memo to employees Monday. "Obviously, Boeing cannot absorb our 787 fuselage sections beyond the capacity of their own assembly line -- which has not been moving.

"Up to now, we have continued to work on our fuselage sections, getting them ready for delivery to Boeing," Romero added. "Now we must extend our temporary shutdown to include most of our assembly operations, except for installing engineering changes on airplanes 5 and 6. This will take place within the week."

The Times notes planes 5 and 6 are the next slated for completion in Everett. Romero said she doesn't know when the plant will resume production.

"The length of this temporary shutdown will be determined after we receive a revised 787 schedule from Boeing, which we expect within the next 30 days," she wrote in the memo. "However, we would anticipate that the shutdown would be at least the same length as the strike, likely longer."

FMI: www.voughtaircraft.com/, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC