Three New Runways To Open This Week | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Nov 18, 2008

Three New Runways To Open This Week

New Landing Strips At SEA, ORD, IAD Weren't Cheap

Just in time for the Thanksgiving holiday weekend travel peak, USA Today reports three large US commercial airports are all scheduled to bring new runway capacity online this Thursday.

In the Pacific Northwest, where poor visibility is a threat much of the year, Seattle-Tacoma International Airport has struggled for years with two parallel runways which are too close together to allow simultaneous approaches at minimums.

The new, 8,500-foot west runway 16R/34L will solve that problem. The runway cost a cool $1 billion -- that's not a typo -- to build, and required the acquisition and demolition of more than 400 houses. It's likely most fliers will feel it's worth the cost, however... as SeaTac historically sees low clouds 44 percent of the time.

In Chicago, O'Hare International's controversial sixth runway will open, despite questions surrounding how to fund $15 billion in associated improvements during a down economy. The 7,500-foot runway, the airport's sixth, is the first new runway there since 1971.

Along with its new, dedicated "bad weather" control tower, the new runway is projected to reduce delays during times of poor visibility from the current average of 24 minutes to 16.

The runway and tower cost $460 million. Mayor Richard Daly's vision for the airport expansion also includes a new terminal and other improvements, which he hopes to get funded in time for the 2016 Summer Olympics, which the city has bid to host.

Washington Dulles will debut a new 9,400-foot 1L/19R, which gives the airport the capability to handle three incoming flights or takeoffs simultaneously. It's the airport's fourth runway, and was built at a cost of cost $355 million.

FMI: www.portseattle.org/seatac, www.ohare.com, www.metwashairports.com/Dulles/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC