NASA Eyes Two New Glitches Onboard Discovery | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Dec 06, 2006

NASA Eyes Two New Glitches Onboard Discovery

No Word Yet If Power Surge, Glue Will Delay Launch

ANN REALTIME REPORTING 12.06.06 1145 EST: For the moment, the space shuttle Discovery is scheduled to lift off less than 36 hours from now, in what should be a spectacular nighttime launch. But two late-breaking technical glitches may throw the proverbial wrench in those plans.

NASA engineers are debating the impact a brief power surge Tuesday may have had on Discovery's systems. The Associated Press reports the electrical spike occurred as NASA was about to switch power from the launch platform to Discovery itself.

So far, tests have shown the shuttle's main engines, solid rocket boosters and external fuel tank weathered the surge without major problems... but NASA spokesman LeRoy Cain couldn't say the same for the orbiter itself just yet.

The second problem involves the shuttle's two solid rocket boosters. Engineers have determined the glue used to fuse joints between segments of the SRBs may not meet NASA's standards for adhesion.

"The adhesive does not produce the seals," NASA spokeswoman June Malone said, adding that pressure between the segments themselves produce most of the seal.

Since this involves an area that has caused problems before, however -- it was a gap between those seals, caused by bitter cold temperatures, that led to the loss of Challenger in 1986 --  NASA will likely take a very close look to make sure the shuttle is still safe to launch.

Weather may also lead to a delay in Thursday night's scheduled launch, with low-hanging clouds stubbornly refusing to blow away from the Cape due to a slow-moving front. High winds could also scrub any later attempts through the weekend, Cain added.

For the moment, however, the countdown clock is still ticking towards launch tomorrow night.

"We're on track and on target for Thursday," Cain said.

FMI: www.nasa.gov/shuttle

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC