Raytheon Team Completes Two Major Milestones On NextGen Air Force GPS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jan 09, 2009

Raytheon Team Completes Two Major Milestones On NextGen Air Force GPS

System Design Review, Engineering Models Demonstrated Last Month

Raytheon tells ANN the company has successfully completed two significant milestones for the US Air Force's next-generation Global Positioning System Control Segment, or GPS OCX, establishing a solid foundation and roadmap to keep the program on track and on schedule.

The Raytheon-led team completed the segment design review and modernized capability engineering model demonstration December 13, 2008.

"These mark major accomplishments for our entire team and significantly burn-down the execution risk on the program," said Bob Canty, Raytheon GPS OCX vice president and program manager. "Our team of industry experts worked seamlessly together to reach and complete these critical tasks and looks forward to meeting all future customer requirements."

The segment design review was a comprehensive review of the team's progress in systems engineering, systems architecture and program management.
Successful completion demonstrates that the design is sufficiently mature and the level of residual risk is acceptable to proceed to the program's next phase. 

In keeping with the "back-to-basics" approach, the team demonstrated the ability to command modernized GPS signals, provide situational awareness and expose data on the network through the modernized capability engineering model demonstration. The Raytheon team also demonstrated time-certain delivery by achieving all model objectives on time and within budget.

Canty added, "Both milestones allowed us to show the customer that we have met their requirements, significantly reduced program risk and are well-positioned to deliver our GPS OCX solution. Our back-to-basics approach to developing our GPS control segment demonstrates our understanding and alignment with the needs of our US Air Force customer."

The Raytheon-led team is on track to complete the remaining program milestones and is working under a $160 million Phase A system design and risk reduction contract. The contract was awarded by the Air Force Space and Missile Systems Center, Los Angeles Air Force Base, in November 2007 to produce the new control segment for the current and future GPS systems.

The completion of the segment design review and modernized capability engineering model is an accomplishment of Raytheon Company, ITT, The Boeing Company, Infinity Engineering Systems, Jet Propulsion Laboratory, SRI International and Braxton Technologies.

FMI: www.raytheon.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC