NTSB Issues Seventh Update On JAL Boeing 787 Battery Fire Investigation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Feb 02, 2013

NTSB Issues Seventh Update On JAL Boeing 787 Battery Fire Investigation

No Anomalies Detected After Multiple Examinations

The NTSB on Friday released the seventh update on its investigation into the Jan. 7 fire aboard a Japan Airlines Boeing 787 at Logan International Airport in Boston.

The auxiliary power unit battery, manufactured by GS Yuasa, was the original battery delivered with the airplane on December 20, 2012. It is comprised of eight individual cells. All eight cells came from the same manufacturing lot in July 2012. The battery was assembled in September 2012 and installed on the aircraft on October 15, 2012. It was first charged on October 19, 2012.

Examination and testing of an exemplar battery got underway earlier this week at the Carderock Division of the Naval Surface Warfare Center laboratories in West Bethesda, MD. The tests consisted of electrical measurements, mass measurements, and infrared thermal imaging of each cell, with no anomalies noted. The cells are currently undergoing CT scanning to examine their internal condition. In addition, on Thursday, a battery expert from the Department of Energy joined the investigative team to lend his expertise to the ongoing testing and validation work.

FMI: www.ntsb.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC