Lockheed Martin Rolls Out First HC-130J Combat Rescue Tanker | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sun, Apr 25, 2010

Lockheed Martin Rolls Out First HC-130J Combat Rescue Tanker

New Model To Replace Older HC And MC 130's

The first of a new fleet of HC-130J combat rescue tankers for the U.S. Air Force's Air Combat Command (ACC) was unveiled by Lockheed Martin during a ceremony in Marietta, GA Monday. Lockheed Martin is contracted with the U.S. Air Force to build 21 C130J Super Hercules to replace aging fleets of combat search and rescue HC-130s and special operations MC130s. The U.S. Air Force is authorized to acquire up to 31 HC/MC130Js (11 HCs and 20 MCs).


Lockheed Martin Photo

"Personnel recovery is one of the Air Force's core missions and vital to what we do in defense of America," said Maj. Gen. Thomas K. Andersen, director of requirements, Headquarters ACC. "The mission is demanding and we are grateful to those [employees] of Lockheed Martin assembled here that have given us a world-class aircraft ready for the demands of the mission," he continued. "The HC-130J will enable us to meet the expanding operational tasks that we face today - wartime operations in Operation Enduring Freedom and the Horn of Africa, and relief operations in the continental United States as well as in areas like Haiti and Chile. For that, ACC, the Air Force and the nation thank you."

"Yet again, we see the C-130 setting new standards for mission flexibility," said Ross Reynolds, Lockheed Martin vice president for C-130 programs. "This new configuration of the proven C-130J will give ACC unparalleled capability for combat search and rescue. As demand for the C-130J continues to grow around the world, we will see more ways this aircraft can meet the demands of any operator and mission."

The new aircraft, which is based on a KC-130J tanker baseline, will have the Enhanced Service Life Wing, Enhanced Cargo Handling System, a Universal Aerial Refueling Receptacle Slipway Installation (boom refueling receptacle), an electro-optical/infrared sensor, a combat systems operator station on the flight deck, and provisions for the large aircraft infrared countermeasures system. In-line production of this configuration reduces cost and risk, and meets the required 2012 initial operational capability.

FMI: www.lockheedmartin.com

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC