Tue, May 07, 2013
Seeks To Replace Current 'Marine One' Aircraft
The Navy has issued a Request for Proposal (RFP) in the Presidential Helicopter Replacement Program (VXX). Proposals are due in 90 days with a goal to award a fixed-price incentive engineering and manufacturing development (EMD) contract, with production options, by mid-calendar year 2014.
“Our acquisition approach includes a full and open competition to select a prime contractor that can best integrate mature subsystems into an air vehicle currently in production for an affordable solution that meets mission requirements,” said Captain Dean Peters, the program manager charged with development of the replacement aircraft. “We’re seeking a technically viable, cost-effective vertical lift aircraft to replace the current fleet as these reach the end of their useful service life. The Department of the Navy is committed to deliver a safe and reliable new Presidential Helicopter fleet, while maintaining the In-Service Fleet until that replacement is fielded.”
During the EMD phase, the selected contractor will provide six test aircraft, four of which will become operational aircraft. During the production phase, the RFP calls for 17 operational aircraft (four in low-rate initial production (LRIP) 1, five in LRIP 2 and eight in full-rate production), for a fleet total of 21 aircraft.
The scope of the RFP also includes associated support equipment for the aircraft, integration of mature, government-defined mission systems into an existing aircraft, development of a training system, including a flight training device and a maintenance training device; logistics, engineering and test and evaluation support; and the appropriate security environment.
The Marine Corps currently operates eleven VH-3D and eight VH-60N helicopters; the VH-3Ds were originally placed in service in 1974 and 1975, and the VH-60s entered service in the 1980s. Both aircraft are well past their original twenty-year service life expectations. Safe operations have been sustained with a comprehensive overhaul cycle at relatively short, three-year intervals.
(White House image of current Marine One landing)
More News
Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]
Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]
“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]
How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]
Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]