AD: International Aero Engines AG Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Mar 27, 2021

AD: International Aero Engines AG Turbofan Engines

AD 2021-05-18 Required Initial And Repetitive Borescope Inspections (BSIs) Of The M-Flange

The FAA is superseding Airworthiness Directive (AD) 2019-06-06 for all International Aero Engines AG (IAE) V2500-A1, V2522-A5, V2524-A5, V2525-D5, V2527-A5, V2527E-A5, V2527M-A5, V2528-D5, V2530-A5, and V2533-A5 model turbofan engines.

AD 2019-06-06 required initial and repetitive borescope inspections (BSIs) of the M-flange and, if it fails the inspection, replacement of the diffuser case with a part eligible for installation. This AD requires an initial BSI of the M-flange and, if it fails the inspection, repetitive BSIs of the M-flange until replacement of the diffuser case M-flange. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective April 29, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 2019-06-06, Amendment 39-19604 (84 FR 11642, March 28, 2019), (AD 2019-06-06). AD 2019-06-06 applied to all IAE V2500-A1, V2522-A5, V2524-A5, V2525-D5, V2527-A5, V2527E-A5, V2527M-A5, V2528-D5, V2530-A5, and V2533-A5 model turbofan engines. The NPRM published in the Federal Register on September 9, 2020 (85 FR 55624). The NPRM was prompted by a crack found at the diffuser case M-flange during overhaul inspection.

Since the FAA issued AD 2019-06-06, the manufacturer performed an updated safety risk analysis, which resulted in reducing the M-flange inspection intervals and adding the performance of a replacement of the diffuser case M-flange, which terminates the need for repetitive BSIs of the M-flange. In the NPRM, the FAA proposed to require an initial BSI of the M-flange and, if it fails the inspection, repetitive BSIs of the M-flange until replacement of the diffuser case M-flange.

FMI: www.regulations.gov

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC