Please Hold Your Applause -- Airbus Says A380 Wiring Work Remains | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jan 26, 2007

Please Hold Your Applause -- Airbus Says A380 Wiring Work Remains

Should Be Ironed Out By 26th Airframe

It appears word Airbus this week had solved a series of technical glitches with stubborn wiring harnesses on its A380 megajumbo may have been a tad optimistic... as the European planemaker said Thursday problems had been solved on the first aircraft only.

Reuters reports Gerhard Puttfarcken, head of Airbus' German operations, told a German newspaper this week Airbus had solved its wiring problems with the A380. Numerous news outlets, including ANN, quickly hailed the news as a long-awaited step in the righr direction for the beleagured planemaker.

Puttfarcken clarified his comments Thursday, however... stating Airbus had only solved the wiring problems on the aircraft scheduled for delivery to launch customer Singapore Airlines later this year, but work remains on other airframes.

That's good news for Singapore Airlines... but questions remain for subsequent airframes.

"We are creating the conditions so that in future there will be one common platform from all the sites," Puttfarcken told a briefing for French journalists Thursday.

While it's not the major revelation many originally thought, the news is still a step in the right direction for Airbus as it attempts to regain credibility for its oft-delayed A380 program.

The wiring issue stemmed from incompatible design specs used by Airbus' French and German plants -- harnesses made in one plant, did not line up with the fuselage segments produced by another. Airbus hopes to have a common design platform in place by the time the 26th airframe is manufactured.

Which means for the moment, Airbus will have to rework the problematic wiring harnesses on each airframe.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC