AD: The Boeing Company Airplanes (747) | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 08, 2012

AD: The Boeing Company Airplanes (747)

AD NUMBER: 2012-20-03

PRODUCT: Certain The Boeing Company Model 747 airplanes.
SUBJECT: Airworthiness Directive 2012-20-03
ACTION: Final Rule

SUMMARY: The FAA is superseding an existing airworthiness directive (AD) for the product listed above. That AD currently requires repetitive visual inspections around the bushings of the wing landing gear (WLG) beam outboard end fittings for corrosion, and rework if necessary; and ultrasonic inspections for cracks of the outboard end fittings of the WLG support beams, and rework if necessary.

This new AD adds airplanes and adds repetitive inspections of the outboard end fitting of the left and right WLG support beams for cracks and corrosion, and corrective actions if necessary. This AD was prompted by new reports of corrosion damage to the end fittings of the WLG support beams, and one report of subsequent cracking in the end fittings.

The FAA is issuing this AD to detect and correct corrosion and subsequent cracking in the outboard end fittings, which could result in separation of the fitting and damage to adjacent flight control cables and hydraulic systems and consequent reduced controllability of the airplane.

DATES: This AD is effective November 9, 2012.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC