NASA Engineers Wrap Up Acoustic Testing For SLS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Sep 07, 2014

NASA Engineers Wrap Up Acoustic Testing For SLS

Five-Percent-Scale Model Helping Determine Likely Sound Levels At Liftoff

Engineers at NASA's Marshall Space Flight Center in Huntsville, Alabama, have wrapped up acoustic testing on a 5-percent scale model of NASA's Space Launch System. The Aug.28 test, the 34th in the series, will help NASA engineers understand how loud the SLS vehicle will be during liftoff. Data from the test series will be used to design the water sound suppression system that reduces liftoff vibrations on the vehicle.  SLS will be the most powerful rocket ever built for deep space missions.

The Scale Model Acoustic test article has four operational liquid engines and two solid rocket motors to represent the propulsion system for SLS. The launch structure also has working water delivery systems to represent its sound suppression system. The test article can be elevated to capture how the liftoff noise changes as the vehicle launches to space. Hot-fire testing began in January and will end this fall.

"We have almost completed testing to encompass all of the liftoff noise levels SLS could experience during launch," said Jeremy Kenny, SLS acoustics engineer at the Marshall Center, prior to the test. "The latest test will inform us of the liftoff noise levels as the vehicle is positioned approximately 150 feet above the deck that the model is positioned on."

"This has been a very successful test program," Kenny added. "Not only has our team gotten a better understanding of the noise levels expected at launch, but we've also proven out the effectiveness of the water suppression systems currently being installed at NASA's Kennedy Space Center."

The test program is led by Marshall's Propulsion Department in the Engineering Directorate, with additional engineering support across several NASA centers. The Marshall Center manages the SLS Program for the agency.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC