Boeing May Have New Dreamliner Timeline By September | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 25, 2009

Boeing May Have New Dreamliner Timeline By September

Second Round Of Taxi Tests Completed Last Week

Boeing Vice President for Marketing Randy Tinseth said in his blog that a new timeline for the B787 Dreamliner may come late this quarter, which would be the end of September. "(O)ur focus is on developing and implementing a detailed plan for design, analysis, component tests, full-scale static testing and production modification. This takes time, resources and many organizations working together. We plan to announce the new program schedule later this quarter," he wrote on Monday.

Tinseth also reported that the second dreamliner (ZA002) completed low speed taxi tests at Paine field last week. The aircraft was painted in ANA livery, one of the airlines waiting for production to get underway. The tests included taxi speeds up to 100 knots, as well as a 'brakes only' stopping tests for the airplane.

ZA001 Taxi Test July Photo Courtesy Boeing

Tinseth said the "side of body" modifications of the test airplanes still need to be resolved before they are ready to fly. Meanwhile "(t)he team tells me the airplane is performing well, and completing this testing now will be very helpful as we get closer to first flight on Airplane #1," he wrote in the blog.

Boeing engineers will now analyze the data collected from this second round of taxi tests.

FMI: http://boeingblogs.com/randy/

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC