Discovery To Go Back To The Garage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 15, 2010

Discovery To Go Back To The Garage

Will Be "Rolled Back" To VAB For Further Fuel Tank Inspections

Technicians at NASA Kennedy Space Center's Launch Pad 39A in Florida are moving ahead with plans for a tanking test for space shuttle Discovery's external fuel tank, which now will be no earlier than Friday, Dec. 17, weather permitting. Cold and windy conditions have slowed test preparation. The test will help verify repairs associated with cracks on the tops of two 21-foot-long, U-shaped aluminum brackets, called stringers, and help engineers determine what caused the cracks in the first place during Discovery's launch countdown on Nov. 5.

Shuttle managers also officially decided late Monday afternoon that following the tanking test, Discovery will be rolled back into Kennedy's Vehicle Assembly Building (VAB) to allow its external tank to undergo additional image scans. Rollback is expected to occur 4-5 days after the tanking test. Once in the VAB, technicians will collect x-ray data on stringers on the back side of the external tank midsection, called the intertank, which is not accessible at the launch pad. Additionally, the test instrumentation and foam insulation on those areas of the intertank will be removed while the stringer inspections are going on in parallel.

At the launch pad, crews currently are finishing installing 89 strain gauges and temperature sensors for the tanking test to precisely record movement and temperatures from the intertank as it chills and warms again during the loading of propellants and emptying process. The tank holds super-cold liquid oxygen and liquid hydrogen, which cause the tank to shrink by about half an inch.

Managers and engineers will review the data gathered from the tanking test and additional image scans before determining the next course of action. Currently, managers plan to have Discovery returned to the launch pad in January ahead of its next launch opportunity, which is no earlier than Feb. 3 at 0134 EST.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC