AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, Jul 18, 2021

AD: The Boeing Company Airplanes

AD 2021-13-02 Requires Installation Of An Insulation Blanket Assembly

The FAA is adopting a new airworthiness directive (AD) for certain The Boeing Company Model 777-300ER series airplanes.

This AD was prompted by a report that a production design change to certain insulation blankets inadvertently opened up leakage paths for halon and smoke to escape from the aft cargo compartment in the event of a fire. This AD requires installation of an insulation blanket assembly on top of existing insulation blankets in certain areas of the forward endwall in the aft cargo compartment. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective August 19, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain The Boeing Company Model 777-300ER series airplanes. The NPRM published in the Federal Register on December 29, 2020 (85 FR 85557).

The NPRM was prompted by report indicating that a production design change to certain insulation blankets inadvertently opened up leakage paths for halon and smoke to escape from the aft cargo compartment in the event of a fire.

In the NPRM, the FAA proposed to require installation of an insulation blanket assembly on top of existing insulation blankets in certain areas of the forward endwall in the aft cargo compartment. The FAA is issuing this AD to address increased leakage paths, which, in the event of a fire, could result in loss of fire suppressant in the cargo compartment, and could lead to an uncontained fire and subsequent loss of the airplane.

FMI: www.regulations.gov

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC