Why Did NASA Push So Hard? | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jul 14, 2005

Why Did NASA Push So Hard?

Day After Launch Scrub, Space Agency Criticized For Speeding Preps

With the shuttle program under the world's microscope as it returns to flight, why did NASA engineers start the countdown without checking the external fuel tank’s sensors? Those sensors were already pegged as problematic when NASA delayed the launch in April. The answer: engineers said they were comfortable that the issue was nothing more than an “unexplained anomaly.”

"We became comfortable as a group, as a management team, that this was an acceptable posture to go fly in," deputy shuttle program manager Wayne Hale said, quoted by the Associated Press, "and we also knew that if something were to happen during a launch countdown, we would do this test and we would find it. And guess what? We did the test, we found something and we stopped. We took no risk. We're not flying with this."

The fuel depletion sensor failure that stopped Wednesday’s launch was one of two issues that caused NASA officials some measure of embarrassment during the launch scrub. Earlier, a plastic windowpane simply fell out of the space vehicle, damaging some of Discovery’s sensitive thermal tiles.

Discovery will not launch until at least Saturday -- a delay that could run much longer. At this point, it’s not clear whether the shuttle can be repaired on the pad or will have to be returned to the Vehicle Assembly Building.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC