AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Jun 27, 2021

AD: General Electric Company Turbofan Engines

AD 2021-11-07 Requires Inspection Of The Stages 6-10 Compressor Rotor Spool

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) GEnx-1B64, 1B64/P1, -1B64/P2, -1B67, -1B67/P1, -1B67/P2, -1B70, -1B70/75/P1, -1B70/75/P2, -1B70/P1, -1B70/P2, -1B70C/P1, -1B70C/P2, -1B74/75/P1, -1B74/75/P2, -1B76/P2, -1B76A/P2, -2B67, -2B67/P, and -2B67B model turbofan engines.

This AD was prompted by a finding during an inspection by the manufacturer that two stages 6-10 compressor rotor spools in the high-pressure compressor (HPC) assembly were damaged at similar locations. Additionally, the manufacturer reported that certain stages 6-10 compressor rotor spool webs did not undergo a required fluorescent penetrant inspection (FPI) during production. This AD requires inspection of the stages 6-10 compressor rotor spool and, depending on the results of the inspection, replacement of the stages 6-10 compressor rotor spool. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective July 30, 2021.

In the NPRM, the FAA proposed to require inspection of the stages 6-10 compressor rotor spool. Operators of certain affected GEnx-1B or GEnx-2B model turbofan engines have already completed acceptable inspections of the aft web of stage 6, stage 7, and stage 8 of the stages 6-10 compressor  rotor spool. The FAA proposed to require operators of those affected engines to complete the inspection of the stages 6-10 compressor rotor spool no later than the next engine shop visit. The FAA proposed to require all other remaining affected GEnx-1B and GEnx-2B model turbofan engines to complete this inspection by the next engine shop visit, before the stages 6-10 compressor rotor spools accumulate 6,500 cycles since new, or before further flight if 6,500 cycles since new has already been accumulated as of the effective date of this AD. Depending on the results of the inspection, the FAA proposed to require replacement of the stages 6-10 compressor rotor spool with a part eligible for installation. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC