Boeing Completes Preliminary Design Review Of CTS-100 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

Airborne Hi-Def On YouTube

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Fri, Mar 16, 2012

Boeing Completes Preliminary Design Review Of CTS-100

Commercial Crew Space Transportation Vehicle Includes Launch Vehicle And Ground System

A Preliminary Design Review (PDR) of Boeing’s integrated Commercial Crew Space Transportation system, which includes the Crew Space Transportation (CST)-100 spacecraft,was completed on March 12. The integrated system will provide the United States with the capability to transport people and cargo to the International Space Station (ISS), the Bigelow Space Complex and other destinations in low Earth orbit.

The system PDR, which included the CST-100 spacecraft (Boeing artist's concept pictured), launch vehicle and ground system, evaluated technical adequacy, progress and risk resolution of the design and test approach. “The progress made by the Commercial Crew team has been outstanding. It is clear that this team has the discipline and the right design, test and safety approaches and processes to ensure a safe, reliable and affordable transportation system by the middle of the decade,” said John Mulholland, vice president and program manager, Boeing Commercial Programs.

“Boeing is leveraging not only the enduring spaceflight capabilities resulting from our 50-year heritage supporting human spaceflight, but also our contemporary expertise and experience, to achieve milestones toward the future of human spaceflight such as this PDR,” Mulholland added.

The PDR included representatives from Boeing, NASA, the Federal Aviation Administration and independent consultants. They examined all milestones accomplished in the development of the integrated system design since the Delta System Definition review that was conducted in May 2011, under NASA’s Commercial Crew Development Space Act Agreement.

Boeing has scheduled additional tests to be performed in 2012, including a launch abort engine hot fire test series, which was successfully completed on March 9, parachute drop tests in April, a landing air bag test series in May, a forward heat shield jettison test in June, and an attitude control engine hot fire test in June, to gather additional data on key functional elements of the spacecraft design.

The Boeing Commercial Crew program includes the design, manufacture, test and evaluation, and demonstration of the CST-100 spacecraft, launch vehicle and mission operations -- all part of Boeing’s Commercial Crew Transportation System -- for NASA’s Commercial Crew Development program. This system will provide crewed flights to the ISS and also support Bigelow Aerospace’s orbital space complex. The program is based on Boeing’s experience and innovation of over 50 years of human spaceflight and nearly 100 years of commercial aviation.

The CST-100 is a reusable capsule-shaped spacecraft based on proven materials and subsystem technologies that can transport up to seven people, or a combination of people and cargo. Boeing has designed the spacecraft to be compatible with a variety of expendable rockets. The company has selected the United Launch Alliance’s Atlas V launch vehicle for initial CST-100 test flights in 2015.

FMI: www.boeing.com

Advertisement

More News

Airborne 05.25.16: Canada SeaPlane Regs, Blimp Downed, Citation Longitude Mated

Also: USAF Hassled, Hummel UltraCruiser, Helo Limits, FAA Video, Greg Connell Accident, Medical Helo Suit, Bombardier's 100th VistaJet Canada is proposing changes to their seaplane>[...]

Icon Steps Back, Admits Curtailed Production Plan

Finally Talking (And Still Hyping), Icon Production Plans Take A Big Hit The following is the text of a release from Icon Aircraft (bluster and all)... ANN Analysis and industry re>[...]

Solar Impulse 2 Is En Route To Lehigh Valley, PA

Atlantic Crossing Next Major Hurdle Solar Impulse 2 (Si2) departed Dayton (OH) International Airport with Bertrand Piccard at the controls, this morning at 0402 local time (UTC-4).>[...]

Icon Controversy Continues, But Icon Has Yet To Speak Up

The Company That Won't Answer Questions, May Finally Have To Do So ANN has been bombarded with info and reports concerning the health and well-being of the Icon Aircraft program...>[...]

ANN's Daily Aero-Linx (05.26.16)

Safety Management System (SMS) This FAA website was created as a public resource for those seeking to learn more about SMS within the aviation industry and the FAA.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC