FAA Delivers FEIS to Panama City For Proposed Airport Relocation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, May 14, 2006

FAA Delivers FEIS to Panama City For Proposed Airport Relocation

FAA Selects West Bay Site 8,400-foot Runway as Preferred Alternative

The Panama City - Bay County Airport and Industrial District (Airport Authority) tells ANN that it has received the FAA's Final Environmental Impact Statement (FEIS) on the proposed relocation of the Panama City - Bay County International Airport.

According to the FAA's FEIS:

"The FAA selects the West Bay Site 8,400-foot Alternative as its preferred alternative. For the reasons presented throughout this FEIS, the FAA has selected this alternative as its preferred alternative because of its superior ability to meet the purposes and needs of the project with fewer constraints than presented by any of the Existing Site alternatives. The FAA has also selected this alternative because the West Bay Site has been deemed the operationally preferable location as compared to the existing site." (FEIS, pp. S12)

"We've got a lot of work ahead of us, but this is a significant milestone," said Airport Executive Director Randy Curtis. "We are extremely grateful to the FAA for the time, attention and effort they have devoted to our airport. We clearly share the same goal - to provide the people of Bay County an airport that meets all federal safety and design standards and can operate without constraints. Today, we are one step closer to achieving that goal."

The proposed airport relocation site is near West Bay on land owned by The St. Joe Company.

The FAA has indicated it will issue its final Record of Decision (ROD) regarding airport relocation in September 2006.

FMI: www.pcairport.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC