Oregon Aviation Department Faces Questions Over Contracts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Aug 25, 2006

Oregon Aviation Department Faces Questions Over Contracts

Job's Not Finished Until The Paperwork Is Done

Did the left hand know what the right hand was doing? That's the question on the minds of many at the Oregon Department of Aviation right now... as state auditors have found evidence the agency isn't keeping track of contracts worth $1.2 million with outside companies handling construction at state airports.

Those deals were reached in the 2004-2005 fiscal year, at a time when the agency underwent a change in leadership.

"Not only is the prior director gone, but the folks that managed those projects are no longer there," said Mike Burrill Sr., chairman of the board that oversees the agency, to the Salem Statesman-Journal.

Under Oregon law, state agencies are required to hold onto all contracts and related documentation for six to 10 years... but during a recent audit, state investigators couldn't find copies of those contracts -- leading the state to wonder if the department paid a fair price for the goods and services it received.

Despite the trouble, the state auditor says he is confident the work was performed... and the contracts were prepared, but somehow disappeared later, or just can't be found by newer staff members.

"I would bet my life on the fact that there were and are contracts out there," Burrill said. "There's no doubt in my mind that we had them."

Auditors also praised the department for improvements since previous audits... as 10 of 11 previously identified issues have been resolved.

FMI: www.aviation.state.or.us

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC