Raytheon Wins NextGen Contract to Study NAS Needs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 07.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.23.14 **
** Airborne 07.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.21.14 **
** Airborne 07.18.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.18.14 **

Thu, May 07, 2009

Raytheon Wins NextGen Contract to Study NAS Needs

Raytheon has been awarded a seven-month, firm-fixed-price contract to study the NextGen Integrated Communications, Navigation and Surveillance architecture and determine the National Airspace System's needs for 2018 to 2025.

"The next generation of airspace management must support a broad array of capabilities - from classic aircraft with minimal automation to highly integrated, multi-sensor aircraft, including unmanned aerial systems," said Andy Zogg, Raytheon vice president for Command and Control Systems. "Our study will identify the alternative CNS architecture needed to meet growing capacity while providing the efficiencies necessary to ensure safe operations."

The study analyzes ICNS interfaces to operator flight planning systems, aircraft capabilities, avionics functions and Federal Aviation Administration automation systems. The $2.3 million contract was awarded by the NextGen Institute, a venture between the National Center for Advanced Technologies and the FAA. The Joint Planning and Development Office will access the Institute to gain private sector expertise, tools and facilities for NextGen activities.

The Raytheon-led team includes Rockwell Collins, ARINC, Aviation Management Associates and Thales. NextGen is the FAA's plan to modernize the National Airspace System (NAS) through 2025. Through NextGen, the FAA is addressing the impact of air traffic growth by increasing NAS capacity and efficiency while simultaneously improving safety, reducing environmental impacts, and increasing user access to the NAS. To achieve its NextGen goals, the FAA is implementing new Performance-Based Navigation routes and procedures that leverage emerging technologies and aircraft navigation capabilities.

FMI: www.raytheon.com

Advertisement

More News

FAA Extends NOTAM For Ben Gurion International Airport

Adds 24 HoursTo Ban On US Flights To Tel Aviv The FAA has issued another Notice to Airmen (NOTAM) informing U.S. airlines that Tuesday's NOTAM flight remains in effect for Israel's>[...]

Airborne 07.23.14: Garmin's 7 Inch Touch, Equusearch v FAA, Andreini Family Sues

Also: GA Investment, Bud and Ross Granley, C-9 Farewell, Jepp FlightDeck, How To Find ANN At Oshkosh Garmin’s “Team X” is dedicated to experimental aircraft avion>[...]

ANN's Daily Aero-Linx (07.24.14)

Abandoned & Little Known Airfields Obviously the author's labor of love, "Abandoned & Little Known Airfields" is a listing by state of airstrips either off the beaten path,>[...]

ANN's Daily Aero-Term (07.24.14): Peak Gust

The highest instantaneous wind speed observed or recorded.>[...]

Aero-News: Quote Of The Day (07.24.14)

"Participation at the Oshkosh airshow has become a staple for NTSB investigators and staff.” Source: NTSB Acting Chairman Christopher A. Hart.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC