NASA Closes In On Hydrogen Leak Fix | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 30, 2009

NASA Closes In On Hydrogen Leak Fix

"Tanking Test" Still Set For Wednesday

At NASA's Kennedy Space Center in Florida, repairs are nearing completion on the plate that attaches a gaseous hydrogen vent line to space shuttle Endeavour's external fuel tank. The new, two-piece seals were installed and tightened Friday, new washers were installed Sunday and the vent line has been reattached to the Ground Umbilical Carrier Plate. Monday, the vent line bolts were tightened and the line tested for leaks using helium at ambient temperatures.

The repairs will be verified Wednesday when Endeavour's external tank is filled with liquid hydrogen and liquid oxygen. The tanking test will start at 0700 EDT and last about three hours, followed by a news conference to discuss the results. Both events will be shown live on NASA TV.

Endeavour's airlock was closed and checked for leaks Friday. Replacement spacesuit batteries will be stored in the orbiter's middeck for flight. The next launch attempt for Endeavour is targeted for July 11 at 1939.

Endeavour's STS-127 astronauts conducted an integrated entry simulation Monday in the motion based simulator at NASA's Johnson Space Center in Houston.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC