SBIRS GEO-1 To Be Processed For May 2011 Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Mar 15, 2011

SBIRS GEO-1 To Be Processed For May 2011 Launch

First Satellite In Stationary Orbit To Be Tasked With Missile Detection

The U.S. Air Force and Lockheed Martin have delivered the first geosynchronous (GEO-1) Space Based Infrared System (SBIRS) spacecraft to Cape Canaveral Air Force Station, FL, where it will be prepared for an early May liftoff aboard a United Launch Alliance Atlas V launch vehicle.


SBIRS Clean Room

SBIRS GEO-1, with its highly sophisticated scanning and staring sensors, will provide the nation with significantly improved missile warning capabilities and support other critical missions simultaneously including missile defense, technical intelligence and battlespace awareness.

“Shipment of SBIRS GEO-1 is a testament to the strong government and industry partnership, and the hard work and dedication of the entire SBIRS team. We remain focused on achieving mission success for this critical program,” said Col. Roger Teague, the U.S. Air Force’s Infrared Space Systems Directorate director. “GEO-1 will play a vital role in our national security space architecture, and we look forward to getting this satellite on-orbit.”


SBIRS Being Loaded

 SBIRS GEO-1 will now be prepared for launch at Cape Canaveral Air Force Station’s former Defense Satellite Communications System (DSCS) Processing Facility, which was upgraded significantly in preparation for GEO-1. Facility upgrades were made to the electrical power supply, communication networks, environmental control systems, and cleanroom processing areas. A new access road was also built from the landing strip directly to the processing facility, which significantly reduces transport time and risk moving through traffic areas.

Prior to launch, the GEO-1 spacecraft will undergo post shipment testing, fueling and payload fairing encapsulation while in the DSCS Processing Facility. Upon completion of processing, the spacecraft will be mated on top of the Atlas V launch vehicle and perform final integrated testing and closeout preparations for launch. Approximately 24 hours before launch, the Atlas V/SBIRS GEO-1 spacecraft will roll to the launch pad and perform the final countdown preparations for launch.


SBIRS Unloaded At Cape Canaveral

“GEO-1 delivery to Cape Canaveral Air Force Station represents the program’s most significant milestone to-date and I am proud of the entire SBIRS team dedicated to delivering this cutting edge missile warning spacecraft,” said Jeff Smith, Lockheed Martin’s SBIRS vice president and program director. “When GEO-1 is launched , declared operational and its data is fused into the DSP and HEO constellation, SBIRS will deliver unprecedented, global, persistent, infrared surveillance capabilities to our nation for decades to come.”

The 22nd Airlift Squadron of Travis Air Force Base, CA, and the 129th Rescue Wing of Mountain View, CA, provided critical support of the delivery of SBIRS GEO-1. The U.S. Air Force C-5 crew, commanded by Major Brad Silver, ensured GEO-1 was transported safely and efficiently to the launch site, and worked with the SBIRS government and industry team throughout the mission to monitor the payload and ensure its safe delivery. The 129th Rescue Wing, Security Forces Squadron secured the entire operation at Moffet Air Field prior to departure.

FMI: www.af.mil, www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC