Aero-TV: Gulfstream G650 -- NBAA 2011 Production Update | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Nov 16, 2011

Aero-TV: Gulfstream G650 -- NBAA 2011 Production Update

Gulfstream's Fly-by-Wire BizJet Gets Ready For Prime-Time

Just a few weeks ago, the power players at Gulfstream updated one and all on the final details leading up to eventual production of Gulfstream's most ambitious and capable bizjet, yet, the G650.

Gulfstream officials noted that the aircraft has moved several steps closer to its anticipated certification later this year after completing tests of its fly-by-wire system, engine inlet compatibility and operation in hot weather, among other tests. At the time of this update, the four aircraft remaining in the flight-test program had accumulated more than 2,077 hours on more than 626 flights.

“On Sept. 15, we had five G650 aircraft in the air at once,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “Four of the aircraft were conducting flight-test activities, while the fifth aircraft completed a post-production test flight. The level of flight activity speaks to the maturity of the product at this point in the flight-test program. We are moving at a prudent pace toward our certification objective later this year. We are pleased by everything we see.”

Gulfstream has now flown four production aircraft in preparation for induction into final-phase manufacturing, where the aircraft are outfitted and painted. Fourteen aircraft are in the production process. On the flight-test side, Aircraft Number 6005 completed certification ground tests for engine inlet compatibility, conducted for the first time by Gulfstream at the Eglin Air Force Base test facility in Florida. The aircraft utilized Eglin’s fan array to accurately provide the high-wind ground testing. Additionally, the aircraft completed certification ground tests for electromagnetic interference. Following ground testing, the aircraft successfully completed in-flight certification testing in both areas: engine inlet compatibility and electromagnetic interference.

Aircraft Number 6004, the first Gulfstream test aircraft to have a fully outfitted interior, has conducted in-flight tests on the functionality of the G650’s next-generation flight management system, a fundamental part of the avionics, as well as completing extensive cabin system tests and interior acoustic noise surveys. The company completed the Federal Aviation Administration certification tests for hot-weather operations using Aircraft Number 6003, thereby demonstrating the capability to properly cool all of the avionics and electrical equipment under the most extreme conditions.

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012.

FMI: www.gulfstream.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC