Interruption Of The VA239 Countdown: Results Of Preliminary Analysis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Sep 08, 2017

Interruption Of The VA239 Countdown: Results Of Preliminary Analysis

New Launch Date Likely Not Until The End Of September

Just after the ignition of Ariane 5’s main stage Vulcain engine, the on-board computer detected an anomaly affecting electrical equipment on one of the two solid-propellant boosters (EAP). This anomaly led to an interruption of the automated lift-off sequence.

This interruption is perfectly compliant with our procedures which authorize a launch only if 100% of launcher equipment is fully operational. This rule guarantees the reliability and robustness of our launch system.

An analysis started immediately after the countdown interruption. It will continue to identify the anomaly’s cause and determine the measures to be taken in order to resume launch operations as soon as possible.

As the analysis is underway, Ariane 5 was transferred to the Final Assembly Building (BAF) on Thursday, September 7, once the tanks were purged. The two satellites, Intelsat 37e and BSAT-4a, are safe under the fairing atop the launcher.

As soon as the analysis of the anomaly has been completed, Arianespace will announce a new launch date. The objective is to launch around the end of September 2017.

This postponement does not affect the other launches scheduled for the end of 2017.

(Source: Arianespace news release. Image from file)

FMI: www.arianespace.com

Advertisement

More News

Airborne 05.20.24: Van's BK Exit, Bud Anderson, Air Race Classic

Also: ALPA Warns, Aviation Meteorology Reference, Jennifer Homendy Re-Ups, CAF Tampa Bay The court has approved Van's Aircraft's bankruptcy reorganization plans, settling a stressf>[...]

Airborne 05.20.24: Van's BK Exit, Bud Anderson, Air Race Classic

Also: ALPA Warns, Aviation Meteorology Reference, Jennifer Homendy Re-Ups, CAF Tampa Bay The court has approved Van's Aircraft's bankruptcy reorganization plans, settling a stressf>[...]

ANN's Daily Aero-Term (05.18.24): Flameout Pattern

Flameout Pattern An approach normally conducted by a single-engine military aircraft experiencing loss or anticipating loss of engine power or control. The standard overhead approa>[...]

ANN's Daily Aero-Linx (05.18.24)

Aero Linx: VC-25 - Air Force One The mission of the VC-25 aircraft — Air Force One — is to provide air transport for the president of the United States. The presidentia>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC