Army Awards $152 Million Contract For Lakota Variants | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Oct 06, 2010

Army Awards $152 Million Contract For Lakota Variants

UH-72A Aircraft To Be Equipped For Security And Support Battalion Missions

The U.S. Army has awarded  a $67 million contract to EADS North America for the supply of Mission Equipment Packages (MEP) on UH-72A Lakota Light Utility Helicopters to be operated by Army National Guard Security and Support Battalions (S&S Battalions). This contract award is the first phase of a total contract value estimated to be approximately $152 million.


UH-72 Lakota File Photo

Built at the company’s American Eurocopter facility in Columbus, MS, these system improvements will be outfitted on UH-72As deployed throughout the United States where the Army National Guard Lakota aircraft are stationed. The packages expand the Lakota’s use in reconnaissance, border protection, command and control and air movement operations that support U.S. homeland defense and security missions.

“This contract underscores EADS North America’s ability to integrate complex mission systems that meet our warfighters’ needs,” said EADS North America Chairman Ralph D. Crosby, Jr. “It also marks a new milestone in the evolution of the UH-72A, as this capable helicopter is given increasingly diverse operational duties with the U.S. Army. Supporting the S&S mission is further evidence of our industry team’s commitment to delivering state-of-the art products that enable the Army to meet today’s demanding missions.”


File Photo

The UH-72A S&S Battalion configuration includes a forward centerline-mounted camera system with electro-optical and infrared sensors and laser pointer, a 30 million candlepower searchlight, operator console, cockpit and cabin touch-screen displays with moving map, a video management system, a digital video recorder and data downlink system, plus an external hoist and additional avionics and communications equipment.

Deliveries of UH-72As with the S&S Battalion Mission Equipment Package are scheduled to begin in 2011. The contract announced today covers EADS North America’s supply of an initial 36 MEPs, with the U.S. Army expected to ultimately acquire systems to outfit a total of 99 Lakota helicopters.

FMI: www.army.mil, www.eads.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC