100th ISS Spacewalk Will Examine Array Joint Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sat, Dec 15, 2007

100th ISS Spacewalk Will Examine Array Joint Issue

Whitson, Tani To Perform Analysis December 18

An important spacewalk outside the International Space Station is scheduled for next week, that NASA hopes will provide some answers regarding a mysterious problem with a solar array joint. Station Commander Peggy Whitson and Flight Engineer Dan Tani will perform the 100th spacewalk in support of ISS assembly on Tuesday, December 18. They will inspect the starboard Solar Alpha Rotary Joint (SARJ) and the Beta Gimbal Assembly (BGA).

The SARJ and BGA have been temporarily locked in place while the solar arrays still produce power. Whitson and Tani completed a procedure review on Friday and held a tagup with the lead spacewalk officer on the ground.

Kirk Shireman, station program deputy manager called the spacewalk a "fact-finding mission." The spacewalkers will report back to ground controllers what they find and return a trundle assembly back inside the station. Specialists on the ground will use the results to determine how to restore the starboard solar array's sun-tracking capability.

A move of the Mobile Transporter to worksite 4 in the center of the station's truss Friday from worksite 7 -- to provide micrometeoroid debris protection to the spacewalkers -- was postponed Friday after station cameras detected what appeared to be a piece of insulation on the truss track. Flight controllers continue to analyze the situation, according to NASA.

FMI: www.nasa.gov/mission_pages/station/main/index.html

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC