NASA Awards Crew Exploration Vehicle Contracts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jul 20, 2005

NASA Awards Crew Exploration Vehicle Contracts

That's One Small Step For Lockheed...

NASA has authorized two eight-month contracts, each worth approximately $28 million, one to Lockheed Martin Corp. and the other to the team of Northrop Grumman Corp. and The Boeing Co. to support a July 2006 review of the engineering systems for the agency's new Crew Exploration Vehicle (CEV).

During this contract period, in addition to performing sustained engineering in support of the CEV review, the contractors will continue to develop designs for NASA's next-generation vehicle for human space flight and demonstrate ability to manage cost, schedule and risk.

Results of NASA's Exploration Systems Architectural Study, which defines parameters for the new vehicle to replace the Space Shuttle, will be incorporated into a "call for improvements" to be released later this year, inviting proposals from the selected contractors. These proposals will be evaluated for the final selection of a single CEV contractor.

Originally, the selection of a single industry team was planned for 2008, but to reduce or eliminate the time between the Shuttle's retirement in 2010 and the first CEV flight, the selection is planned for early 2006.

The CEV is expected to carry up to six astronauts beyond low-Earth orbit soon after the Space Shuttle is retired in 2010, and then on to the moon as early as 2015. The CEV is a key element of the nation's Vision for Space Exploration, which returns human explorers to the moon, Mars, and beyond.

FMI: www.nasa.gov/home/index.html

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC